亚洲久本草在线中文字幕,欧美一级久久久免费,国产高清一国产aV麻豆网,992精品视频在线,男人j桶女人屁免费网站,尤物yw193在线,300部小U女视频在线麻豆 ,人成乱码一卡二卡三卡,xxxxx在线免费观看,又大又硬又粗又长的日批视频,永久视频免费在线观看,2021久久国产福利国产秒拍,日日噜噜夜夜狠狠视频男男,在线观看酒店嗯啊高潮,日本国产亚洲欧洲第12页,在线观看酒店嗯啊高潮,好深免费国产大片在线观看

Chinese   |   English
Storike Problem

Low-temperature start-up and engine maintenance of the dual-circuit hydraulic power station in winter
Source:Storike Release Date:2021-11-8
Number of reads:177

Winter dual-circuit hydraulic power station low-temperature start-up and engine maintenance: How to start a dual-circuit hydraulic power station in winter low-temperature? 1. At low temperatures, hydraulic oil is relatively viscous. Therefore, the engine of the hydraulic power station should run at a low speed for a sufficient period of time until the oil temperature of the hydraulic oil rises above 10℃ or the bottom of the hydraulic oil tank is felt

Low-temperature start-up and engine maintenance of the dual-circuit hydraulic power station in winter

How to start a dual-circuit hydraulic power station in low winter temperatures

At low temperatures, hydraulic oil is relatively viscous. Therefore, the engine of the hydraulic power station should run at a low speed for a sufficient period of time until the oil temperature of the hydraulic oil rises above 10℃ or the bottom of the hydraulic oil tank feels hot.

2. If the hydraulic power station and the hoses are relatively cold, let the hydraulic oil circulate through the hoses until it is warm before operating the tools and continuing the construction.

Engine maintenance of the dual-circuit hydraulic power station

Comply with the regular maintenance and general repair guidelines for the hydraulic power station engine in this manual. Normal maintenance includes the following aspects:

Clean the sponge air filter every 25 hours of operation.

Clean the air paper filter element every 100 hours of operation.

Replace the axial fuel filter every 100 to 300 hours of operation or replace it in advance as per the actual situation.

Replace the spark plugs every 100 hours of operation.

Change the engine oil after the first 5 hours of operation. It should be replaced every 50 hours of work thereafter. If the engine of the hydraulic power station operates continuously under heavy load or high temperature conditions, the engine oil should be replaced every 25 hours of operation.

When changing the engine oil, also change the oil filter.

The oil level should be checked each time.

Keep the engine clean (wipe with a cloth or brush). Do not rinse it with water.

Clean the air cooling system every 100 hours of operation.

冬季雙回路液壓動(dòng)力站低溫啟動(dòng)及發(fā)動(dòng)機(jī)維護(hù)保養(yǎng)

Low-temperature start-up and engine maintenance of the dual-circuit hydraulic power station in winter